Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Simulation of tunnel boring machine utilization: A case study
1. Simulation of tunnel boring machine utilization: A case study

S. Moosazadeh; H. Aghababaie; Seyed H. Hoseinie; B. Ghodrati

Volume 9, Issue 1 , Winter 2018, , Pages 53-60

Abstract
  Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, ...  Read More
Maintainability measure based on operating environment, a case study: Sungun copper mine
2. Maintainability measure based on operating environment, a case study: Sungun copper mine

A. Nouri Qarahasanlou; M. Ataei; R. Khaolukakaie; B. Ghodrati; M. Mokhberdoran

Volume 8, Issue 3 , Summer 2017, , Pages 511-521

Abstract
  The life cycle cost of a system is influenced by its maintainability. Maintainability is a design parameter, whose operational conditions can affect it significantly. Hence, the effects ...  Read More