Volume 15 (2024)
Volume 14 (2023)
Volume 13 (2022)
Volume 12 (2021)
Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Prediction of Roof Failure in Pre-driven Entries and Selecting a Suitable Type of Recovery Room Method in Longwall Mining

Sajjad Aghababaei; Hossein Jalalifar; Ali Hosseini; Farhad Chinaei; Mehdi Najafi

Volume 15, Issue 1 , January 2024, , Pages 223-237

https://doi.org/10.22044/jme.2023.12787.2321

Abstract
  In this work, two rock engineering system (RES)-based models are presented, the first model to predict the roof failure when a longwall face advances toward a pre-driven recovery room (PDRR) and the second model to select the type of recovery room method for longwall mining. For the first model, an international ...  Read More

Extension of Excavation Damaged Zone Due to Longwall Working Effect

H. Mohammadi; M. A. Ebrahimi Farsangi; H. Jalalifar; A. R. Ahmadi; A. Javaheri

Volume 7, Issue 1 , January 2016, , Pages 13-24

https://doi.org/10.22044/jme.2016.369

Abstract
  In advance longwall mining, the safety of mine network, production rate, and consequently, economic conditions of a mine are dependent on the stability conditions of gate roadways. The gate roadway stability is a function of two important factors: 1) characteristics of the excavation damaged zone (EDZ) ...  Read More