Exploitation
R. Shamsi; M. S. Amini; H. Dehghani; M. Bascompta; B. Jodeiri Shokri; Sh. Entezam
Abstract
This paper attempted to estimate the amount of flyrock in the Angoran mine in Zanjan province, Iran using the gene expression programming (GEP) predictive technique. The input data, including flyrock, mean depth of the hole, powder factor, stemming, explosive weight, number of holes, and booster were ...
Read More
This paper attempted to estimate the amount of flyrock in the Angoran mine in Zanjan province, Iran using the gene expression programming (GEP) predictive technique. The input data, including flyrock, mean depth of the hole, powder factor, stemming, explosive weight, number of holes, and booster were collected from the mine. Then, using GEP, a series of intelligent equations were proposed to predict flyrock distance. The best GEP equation was selected based on some well-established statistical indices in the next stage. The coefficient of determination for training and testing datasets of the GEP equation were 0.890 and 0.798, respectively. The model obtained from the GEP method was then optimized using teaching– learning-based optimization algorithm (TLBO). Based on the results, the correlation coefficient of training and testing data increased to 91% and 89%, which increased the accuracy of the Equation. This new intelligent equation could forecast flyrock resulting from mine blasting with a high level of accuracy. The capabilities of this intelligent technique could be further extended to the other blasting environmental issues.
Exploitation
R. Norouzi Masir; M. Ataei; A. Mottahedi
Abstract
The drilling and blasting method is the first choice for rock breakage in surface or underground mines due to its high flexibility against variations and low investment costs. However, any method has its own advantages and disadvantages. The flyrock phenomenon is one of the drilling and blasting disadvantages ...
Read More
The drilling and blasting method is the first choice for rock breakage in surface or underground mines due to its high flexibility against variations and low investment costs. However, any method has its own advantages and disadvantages. The flyrock phenomenon is one of the drilling and blasting disadvantages that the mining engineers have always been faced with in the surface mine blasting operations. Flyrock may lead to fatality and destroy mine equipment and structures, and so its risk assessment is very essential. For a flyrock risk assessment, the causing events that lead to flyrock along with their probabilities and severities should be identified. For this aim, a combination of the fuzzy fault tree analysis and multi-criteria decision-making methods are used. Based on the results obtained, the relevant causing events of flyrock in surface mines can be categorized into three major groups: design error, human error, and natural error. Finally, using the obtained probabilities and severities for these three groups, the risk matrix is constructed. Based on the risk matrix, the risk numbers of flyrock occurrence due to the design errors, human errors, and natural influence are 12, 6, and 2, respectively. Hence, in order to minimize the flyrock risk, it is very vital for the engineers to select appropriate values for the design events of blasting pattern such as burden, spacing, delays, and hole diameter.