TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period

E. Farrokh

Volume 11, Issue 2 , April 2020, , Pages 539-554

https://doi.org/10.22044/jme.2020.9041.1792

Abstract
  In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating ...  Read More