Exploitation
Payam Esmailnia; Mohsen Dehodar; Parviz Moarefvand
Abstract
Drilling performance is enhanced by thorough well cleaning, which lowers torque and drag, increases penetration rate, and minimizes pipe sticking. Drilling fluid characteristics, cutting size and shape, BHA design, nozzle configuration, well deviation, flow rate, and penetration rate are important influencing ...
Read More
Drilling performance is enhanced by thorough well cleaning, which lowers torque and drag, increases penetration rate, and minimizes pipe sticking. Drilling fluid characteristics, cutting size and shape, BHA design, nozzle configuration, well deviation, flow rate, and penetration rate are important influencing factors. This study assesses these parameters in a controlled laboratory environment. Cutting accumulation zones were identified, and a notable innovation was optimising pump rate, particularly in areas prone to clogging. Examining the combined effects of two stabilizer types, including their positioning and orientation, was a novel approach. Software from the experiment and the Landmark was used to analyze the primary parameters. DOE supported the introduction of a new cutting transporting efficiency index. The effects of different fluid rheologies on cleaning efficiency and pressure loss were investigated in more detail. Performance metrics for various cutting sizes and materials were evaluated, along with drill string rotation. Plots were created to reveal patterns in hole-cleaning effectiveness and pressure drop. Pressure losses were examined under a realistic drill string configuration, with a focus on the effects of nozzle size and various hydraulic scenarios. The pressure drop was unaffected by the stabilizer type used; however, the cleaning effectiveness required careful placement. Denser cuttings resulted in a greater pressure drop and decreased cuttings removal, whereas smaller cuttings were associated with a lower Inverse Hole Cleaning Index (IHCI). In areas where sticking is more likely, the cutting bed height decreased as the pump rate increased.
M. Dehvedar; P. Moarefvand; A.R. Kiyani; A. R. Mansouri
Abstract
Inadequate hole cleaning can lead to many problems in horizontal and directional wells. In this work, we tried to investigate the cutting transport phenomenon by an experimental directional drilling simulator, considering the differences between the operational and experimental conditions. The inclination, ...
Read More
Inadequate hole cleaning can lead to many problems in horizontal and directional wells. In this work, we tried to investigate the cutting transport phenomenon by an experimental directional drilling simulator, considering the differences between the operational and experimental conditions. The inclination, fluid type (water, foam, viscous, and dense), rotary speed (0 and 110 rpm), nozzle bit size (4, 6, and 8 mm), and stabilizer location (8 and 95 cm from the bit) were included in the tests as the main parameters. It could be concluded that the nozzle size and the stabilizer position influenced the hole cleaning time. In vertical wells, by decreasing the nozzle size from 8 mm to 4 mm, the hole cleaning time was increased. The presence of stabilizer reduced the cleaning time, and optimizing the stabilizer position reduced the probability of cutting bed formation in all inclinations. Finally, a third polynomial equation was fitted between the dimensionless mass and the dimensionless cleaning time.