Volume 17 (2026)
Volume 16 (2025)
Volume 15 (2024)
Volume 14 (2023)
Volume 13 (2022)
Volume 12 (2021)
Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Exploitation
Prediction and Mitigation of Blast-Induced Peak Particle Velocity Using Charge per Delay Estimation Methods: A Case Study of the Overburden at Gol Gohar Iron Ore Mine No. 1, Iran

Mahmoud Irannejad parizi; hossein samareh; Hossein Jalalifar; Mohammad Amiri Hosseini

Articles in Press, Accepted Manuscript, Available Online from 16 August 2026

https://doi.org/10.22044/jme.2026.17492.3476

Abstract
  Blast-induced ground vibration is a major concern in surface mines located near sensitive infrastructures. Although many empirical and artificial intelligence models have been developed for predicting peak particle velocity (PPV), the physical definition of charge per delay in multi-row blasting has ...  Read More

Applying a Technical-Economic Approach to Calculate a Suitable Panel Width for Longwall Mining Method

S. Aghababaei; H. Jalalifar; A. Hosseini

Volume 12, Issue 1 , January 2021, , Pages 113-126

https://doi.org/10.22044/jme.2020.9552.1870

Abstract
  Providing an approach to calculate a suitable panel width for the longwall mining method is considered considering both the technical and economic factors. Based on the investigations carried out, a technical-economic model is proposed to calculate a suitable panel width. The proposed model is a combination ...  Read More