Volume 17 (2026)
Volume 16 (2025)
Volume 15 (2024)
Volume 14 (2023)
Volume 13 (2022)
Volume 12 (2021)
Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Exploitation
Development of a Long-term Mining Production Planning Model Considering Working Spaces for In-pit Crushers

Fatemeh Asadi Ooriad; Javad Gholamnejad; Ali Dabagh

Volume 17, Issue 3 , May and June 2026, , Pages 1145-1162

https://doi.org/10.22044/jme.2025.16077.3103

Abstract
  Designing and planning in open-pit mining encompass a series of processes that commence with the preparation of a block model. Subsequently, upon designing the final scope, it culminates with the timing and sequencing of mining blocks, with the aim to maximize the pit's value within specific technical ...  Read More