Volume 17 (2026)
Volume 16 (2025)
Volume 15 (2024)
Volume 14 (2023)
Volume 13 (2022)
Volume 12 (2021)
Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Exploitation
Numerical and Field Analysis the Effect of Primer Location and Air Column Length on Ground Vibration and Limestone Rock Mass Damage in the Power deck Blasting Method

Hassan Bakhshandeh Amnieh; Ebrahim Arefmand; Abbas Majdi

Articles in Press, Accepted Manuscript, Available Online from 04 May 2026

https://doi.org/10.22044/jme.2026.16932.3330

Abstract
  The Power deck blasting technique is widely used in open-pit and underground mines to optimize explosive energy for effective rock fragmentation while minimizing adverse effects. This study examines the influence of primer location and air column length on ground vibration and limestone rock mass damage ...  Read More