Volume 16 (2025)
Volume 15 (2024)
Volume 14 (2023)
Volume 13 (2022)
Volume 12 (2021)
Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Risk Assessment in Quarries using Failure Modes and Effects Analysis Method (Case study: West-Azerbaijan Mines)

Akbar Esmaeilzadeh; Sina Shaffiee Haghshenas; Reza Mikaeil; Giuseppe Guido; Roohollah Shirani Faradonbeh; Roozbeh Abbasi Azghan; Amir Jafarpour; Shadi Taghizadeh

Volume 13, Issue 3 , July 2022, , Pages 715-725

https://doi.org/10.22044/jme.2022.12117.2209

Abstract
  Iran is one of the countries with the largest number of quarry mines in the world. Diamond cutting wire is usually used in quarries to cut dimension stone cubes, which is accompanied by hazardous events. Therefore, detecting and investigating the possible quarry risks is crucial to have a safe and sustainable ...  Read More