Optimization of Delay Times for Reducing Blast-induced Ground Vibration in the Golgohar Mine Using the Signature Hole Analysis

Moein Bahadori; Moahammad Amiri Hosseini; Iman Atighi

Articles in Press, Accepted Manuscript, Available Online from 06 April 2025

https://doi.org/10.22044/jme.2025.15442.2960

Abstract
  As open-pit mining advances, the decreasing separation between blast blocks and surface structures necessitates rigorous control of induced ground vibrations to mitigate structural risks. This study performed 13 single-hole blasting operations at the Golgohar Sirjan Iron Mine processing plant to evaluate ...  Read More