Exploitation
Fatemeh Asadi Ooriad; Javad Gholamnejad; Ali Dabagh
Abstract
Designing and planning in open-pit mining encompass a series of processes that commence with the preparation of a block model. Subsequently, upon designing the final scope, it culminates with the timing and sequencing of mining blocks, with the aim to maximize the pit's value within specific technical ...
Read More
Designing and planning in open-pit mining encompass a series of processes that commence with the preparation of a block model. Subsequently, upon designing the final scope, it culminates with the timing and sequencing of mining blocks, with the aim to maximize the pit's value within specific technical and operational constraints. Mathematical programming methods have proven suitable for optimizing mine production scheduling. Previous studies have addressed various aspects, including the timing of deployment and periodic relocation of in-pit crushers. Nevertheless, significant challenges remain in integrating the in-pit crusher problem with production planning. This paper introduces a new mixed-integer linear programming model for long-term open-pit mine production planning, incorporating constrained pit deepening to enforce predominantly lateral progression throughout the planning horizon. To achieve this, the number of active benches in each time period was reduced, thereby decreasing the need for equipment movement between working benches. Furthermore, with the horizontal progression of the pit, more workspace became available for deploying in-pit crushers, reducing equipment movement costs between benches and overall transportation costs, ultimately lowering the mine's operational expenses. Finally, the proposed model was implemented at the Miduk copper mine. The results demonstrated that the proposed model successfully achieved the expected objectives, resulting in a 52.45% improvement in reducing the number of active benches and regarding execution time reduction, the model showed a 53.32% improvement.
Exploitation
S. Maleki; F. Sotoudeh; F. Sereshki
Abstract
Ventilation is a vital component of an underground mining operation, used to guarantee a safe atmosphere for workers and survive them from the hazardous and toxic gases. In the recent years, engineers have begun to apply new operation research techniques in order to optimize the ventilation systems to ...
Read More
Ventilation is a vital component of an underground mining operation, used to guarantee a safe atmosphere for workers and survive them from the hazardous and toxic gases. In the recent years, engineers have begun to apply new operation research techniques in order to optimize the ventilation systems to assist in achieving a regulatory compliance, reduce ventilation costs, and improve its efficiency. Airflow regulation optimization in mine ventilation networks is described as a minimization model whose objective function is a minimum number of regulators and energy consumption. In this work, all the previously accomplished works were first reviewed. Then a ventilation system was designed for the Western-Razmja coal mine by a manual method, and an axial fan was proposed. Subsequently, the same ventilation system was simulated using the VENTSIM 3D software. The results obtained by computer simulation showed that there was a reliable relation between the manual method and the simulation approach. In the final step, the GAMS software was used to solve a Mathematical Programming (MP) problem to minimize the overall cost of ventilation by determination of the optimum location for the fan and regulators. The final results of this work illustrated that not only the number of regulators were reduced through solving the MP model but also the total resistance of the Western-Razmja coal mine was reduced by 14% from 1.6 to 1.3. Furthermore, it was observed that the total efficiency of the proposed fan was increased.