<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Shahrood University of Technology</PublisherName>
				<JournalTitle>Journal of Mining and Environment</JournalTitle>
				<Issn>2251-8592</Issn>
				<Volume>Volume 1</Volume>
				<Issue>Number 2</Issue>
				<PubDate PubStatus="epublish">
					<Year>2011</Year>
					<Month>06</Month>
					<Day>21</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Determination of the largest pit with the non-negative net profit in the open pit mines</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage></FirstPage>
			<LastPage></LastPage>
			<ELocationID EIdType="pii">14</ELocationID>
			
<ELocationID EIdType="doi">10.22044/jme.2011.14</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>J.</FirstName>
					<LastName>Gholamnejad</LastName>
<Affiliation></Affiliation>

</Author>
<Author>
					<FirstName>A.R.</FirstName>
					<LastName>Mojahedfar</LastName>
<Affiliation></Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2011</Year>
					<Month>06</Month>
					<Day>21</Day>
				</PubDate>
			</History>
		<Abstract>The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage 
that parts of  the mineral deposit  that are economic  to mine are determined. There are  several mathematical, heuristic 
and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the 
total profit whilst satisfying the operational requirement of safe wall slopes. In this paper the concept of largest pit with 
non- negative value is suggested. A mathematical model based on integer programming is then developed to deal with 
this objective. This model was applied on an  iron ore deposit. Results  showed  that obtained pit with  this objective  is 
larger  than  that  of  obtained  by  using  net  profit maximization  and  contains  more  ore,  whilst  the  total  net  profit  of 
ultimate pit  is not negative. This  strategy can also  increase  the  life of mine which  is  in accordance  to  the  sustainable 
development principals.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Ultimate pit limit</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Mathematical Modeling</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">integer programming</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">largest pit</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://jme.shahroodut.ac.ir/article_14_0fd6080fc9c88d3baf99967ceb3704ee.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
