<ArticleTitle>Variational Optimization of Overburden Haul Distance in Deep Porphyry-Copper Open-Pit Mines under a Time-Evolving Geomechanical Boundary Constraint</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>1605</FirstPage>
			<LastPage>1622</LastPage>
			<ELocationID EIdType="pii">3941</ELocationID>
			
<ELocationID EIdType="doi">10.22044/jme.2026.17793.3540</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Sherzod Vafo Ugli</FirstName>
					<LastName>Karimov</LastName>
<Affiliation>mining</Affiliation>

</Author>
<Author>
					<FirstName>Eldor Ilkhom Ugli</FirstName>
					<LastName>Tuychiboev</LastName>
<Affiliation>Mining</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2026</Year>
					<Month>06</Month>
					<Day>05</Day>
				</PubDate>
			</History>
		<Abstract>Near-wall waste dumping can reduce overburden haulage, but the shortest route is limited by slope stability. This study formulates a geomechanically allowable haul distance (GAHD) as a time-dependent lower bound in a discounted haulage optimization problem. The framework combines two-dimensional limit-equilibrium analysis, an effective affine fuel relation, an empirical cycle-time model, integer fleet sizing, an active-set finite-difference trajectory solution, and uncertainty propagation. The contribution is methodological and integrative - a geomechanically constrained planning layer added to haulage optimization - rather than a new mine-planning algorithm. The Kalmakyr copper mine (Almalyk MMC, Uzbekistan) is the primary application; a Muruntau wall section provides a second, structural application of the multi-tier dump concept. Across the four Kalmakyr walls, GAHD is 1.894-1.965 km, with a production-weighted value of 1.909 km. For a 2.0-km operating case, relative to 4.5 km, the model estimates fuel reduction from 86.0 to 51.2 L per trip, cycle-time reduction from 36.5 to 31.1 min, and fleet reduction from 60 to 51 trucks. The boundary advances by approximately 7.2 m yr−1, corresponding to a drift number of 0.02; a static constraint is therefore adequate for this seven-year case, and the moving-boundary formulation becomes relevant for faster-deepening or longer-horizon operations. A 50,000-draw Monte Carlo analysis gives a median net present value of 20.0 M USD and a 5th-95th percentile interval of 6.7-34.0 M USD. The findings support a reproducible decision-support workflow but remain conditional on two-dimensional stability analysis, aggregate fuel data, and site-specific calibration; independent operational validation is required before industrial implementation.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">near-wall dumping</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">haul distance</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Slope Stability</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Optimal control</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://jme.shahroodut.ac.ir/article_3941_e1d7f71a365a9921db0c8b0163d8d718.pdf</ArchiveCopySource>
</Article>
</ArticleSet>