Production planning in mineral exploitation should be undertaken to maximize exploited ore at a minimum unplanned dilution. Unplanned dilution reduction is among the ways to enhance the quality of products, and hence, reduce the associated costs, resulting in a higher profit. In this way, firstly, all the parameters contributing to unplanned dilution in underground stopes and specifically the cut-and-fill stoping method are identified. Secondly, the parameters are weighed using the fuzzy-Delphi analytical hierarchy process. Thirdly, the most effective parameters are selected among the pool of effective parameters. Finally, in order to present a novel classification system for an unplanned dilution assessment, a new index called stope unplanned dilution index (SUDI) is introduced. SUDI represents the extent to which a cut-and-fill stope is susceptible to unplanned dilution. That is, having the value of this index, one may classify the cut-and-fill stopes into five groups according to robustness versus unplanned dilution: very strong, strong, moderate, weak, and very weak. SUDI is applied to10 stopes in different parts of Venarch Manganese Mines (Qom, Iran). In this way, a semi-automatic cavity monitoring system is implemented in the stopes. The regression analysis method shows that there is a relationship between SUDI and the actual unplanned dilution in equivalent linear overbreak/slough with a correlation coefficient (R2 = 0.8957).

Keywords

Main Subjects