[1]. Whittle, J. (1989). The facts and fallacies of open pit optimization. Whittle Programming Pty Ltd., North Balwyn, Victoria, Australia, 1-7.
[2]. Worldwide, E.L.A. (2010). Guidebook for evaluating mining project EIAs. Environmental Law Alliance Worldwide, Eugene, Oregon.
[3]. Dhir, B. (2018). Biotechnological tools for remediation of acid mine drainage (removal of metals from wastewater and leachate). In Bio-Geotechnologies for Mine Site Rehabilitation. 67-82.
[4]. Gazea, B., Adam, K. and Kontopoulos, A. (1996). A review of passive systems for the treatment of acid mine drainage. Minerals engineering. 9 (1): 23-42.
[5]. Trifi, M., Dermech, M., Abdelkrim, C., Azouzi, R. and Hjiri, B. (2018). Extraction procedures of toxic and mobile heavy metal fraction from complex mineralogical tailings affected by acid mine drainage. Arabian Journal of Geosciences. 11 (12): 328.
[6]. Kim, G-M., Kim, D-H., Kang, J-S. and Baek, H. (2014). Treatment of synthetic acid mine drainage using rice wine waste as a carbon source. Environmental earth sciences. 71 (10): 4603-4609.
[7]. Alhamed, M. (2015). Identification of geochemical processes controlling the neutralization of abandoned coal mine drainage using integration of geochemical modelling, geochemical analysis, and batch test: an example from the south of Bochum, Germany. Arabian Journal of Geosciences. 8 (10): 8009-8025.
[8]. Caccetta, L. and Hill, SP. (2003). An application of branch and cut to open pit mine scheduling. Journal of global optimization. 27 (2-3): 349-365.
[9]. Ramazan, S. (2007). The new fundamental tree algorithm for production scheduling of open pit mines. European Journal of Operational Research. 177 (2): 1153-1166.
[10]. Boland, N., Dumitrescu, I., Froyland, G. and Gleixner, AM. (2009). LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Computers & Operations Research. 36 (4): 1064-1089.
[11]. Jelvez, E., Morales, N., Nancel-Penard, P., Peypouquet, J. and Reyes, P. (2016). Aggregation heuristic for the open-pit block scheduling problem. European Journal of Operational Research. 249 (3): 1169-1177.
[12]. Ramazan, S. and Dimitrakopoulos, R. (2013). Production scheduling with uncertain supply: a new solution to the open pit mining problem. Optimization and Engineering. 14 (2): 361-380.
[13]. Lambert, WB. and Newman, AM. (2014). Tailored Lagrangian Relaxation for the open pit block sequencing problem. Annals of Operations Research. 222 (1): 419-438.
[14]. Cullenbine, C., Wood, RK. and Newman, A. (2011). A sliding time window heuristic for open pit mine block sequencing. Optimization Letters. 5 (3): 365-377.
[15]. Lamghari, A., Dimitrakopoulos, R. and Ferland, JA. (2015). A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines. Journal of Global Optimization. 63 (3): 555-582.
[16]. Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E. and Rubio, E. (2012). A new algorithm for the open-pit mine production scheduling problem. Operations Research. 60 (3): 517-528.
[17]. Denby, B. and Schofield, D. (1994). Open-pit design and scheduling by use of genetic algorithms, Transactions of the Institution of Mining and Metallurgy (Section A: Mining Industry). 103: A21-A26.
[18]. Sayadi, A., Tavassoli, S., Monjezi, M. and Rezaei, M. (2014). Application of neural networks to predict net present value in mining projects. Arabian Journal of Geosciences. 7 (3): 1067-1072.
[19]. Kumral, M. and Dowd, P. (2005). A simulated annealing approach to mine production scheduling. Journal of the Operational Research Society. 56:922-930.
[20]. Kumral, M. (2013). Optimizing ore–waste discrimination and block sequencing through simulated annealing. Applied Soft Computing. 13 (8): 3737-3744.
[21]. Mousavi, A., Kozan, E. and Liu, SQ. (2016). Comparative analysis of three metaheuristics for short-term open pit block sequencing. Journal of Heuristics. 22 (3): 301-329.
[22]. Mousavi, A., Kozan, E. and Liu, SQ. (2016). Open-pit block sequencing optimization: A mathematical model and solution technique. Engineering Optimization. 48: 1932-1950.
[23]. Ferland, JA., Amaya, J. and Djuimo, MS. (2007). Application of a particle swarm algorithm to the capacitated open pit mining problem, In Autonomous Robots and Agents, Berlin, Heidelberg,127-133.
[24]. Khan, A. and Niemann-Delius, C. (2014). Production scheduling of open pit mines using particle swarm optimization algorithm. Advances in Operations Research. 2014:1-9.
[25]. Sattarvand, J. and Niemann-Delius, C. (2008). Perspective of metaheuristic optimization methods in open pit production planning. Mineral Resources Management. 24 (4): 143-156.
[26]. Shishvan, MS. and Sattarvand, J. (2015). Long term production planning of open pit mines by ant colony optimization. European Journal of Operational Research. 240 (3): 825-836.
[27]. Lamghari, A. and Dimitrakopoulos, R. (2012). A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. European Journal of Operational Research. 222 (3): 642-652.
[28]. Mokhtarian, Asl. and M. Sattarvand, J. (2016). An imperialist competitive algorithm for solving the production scheduling problem in open pit mine. International Journal of Mining & Geo-Engineering. 50 (1): 131-143.
[29]. Mohammadi, S., Kakaie, R., Ataei, M. and Pourzamani, E. (2017). Determination of the optimum cut-off grades and production scheduling in multi-product open pit mines using imperialist competitive algorithm (ICA). Resources Policy. 51: 39-48.
[30]. Dincer, T. (2001). Application of pit optimisation algorithms beyond open pit limits, 17th International Mining Congress and Exhibition of Turkey-IMCET, 975-395.
[31]. Williams, D., Topal, E., Zang, N. and Scott, P. (2008). Development of a rock dump scheduling model using linear programming, Proc, First International Seminar on the management of Rock Dumps, Stockpiles and Heap Leach Pads, Australian Centre for Geomechanics,Perth. 129-137.
[32]. Ben-Awuah, E., Askari-Nasab, H. and Awuah-Offei, K. (2012). Production Scheduling and Waste Disposal Planning for Oil Sands Mining Using Goal Programming. Journal of Environmental Informatics. 20: 20-33.
[33]. Li, Y., Topal, E. and Williams, D. (2013). Waste rock dumping optimisation using mixed integer programming (MIP). International Journal of Mining, Reclamation and Environment. 27 (6): 425-436.
[34]. Fu, Z., Asad, M. W.A. and Topal, E. (2019). A new model for open-pit production and waste-dump scheduling. Engineering Optimization. 51(4): 718-732.
[35]. Ramazan, S. and Dimitrakopoulos, R. (2004). Recent applications of operations research and efficient MIP formulations in open pit mining, Transactions of Society for Mining, Metallurgy, and Exploration, 316: 73-78.