[1]. Abdel Sabour, A., Dimitrakopoulos, R. (2011). Incorporating geological and Mine, market uncertainties and operational flexibility into open-pit mine design. Journal of Mining Science, 47(2), :191–201.
[2]. Abdel Sabour, S. A., Dimitrakopoulos, R. G., & Kumral, M. (2008). Mine design selection under uncertainty. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 117(2), 53–64. https://doi.org/10.1179/174328608X343065.
[3]. Alipour, A, Khodaiari, A. A., Jafari, A., & Tavakkoli-Moghaddam, R. (2017). Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach. Journal of Mining and Environment, 8(2), 255–267. https://doi.org/10.22044/jme.2017.849.
[4]. Alipour, Aref, Khodaiari, A. A., Jafari, A., & Tavakkoli-Moghaddam, R. (2020). Robustness price of open-pit mine production scheduling. International Journal of Mining and Geo-Engineering, 54(2), 117–122. https://doi.org/10.22059/IJMGE.2019.267417.594762.
[5]. Amponsah, S. Y., Takouda, P. M., & Ben-Awuah, E. (2023). A Multiple Objective Genetic Algorithm Approach for Stochastic Open Pit Production Scheduling Optimisation. International Journal of Mining, Reclamation and Environment, 37(6), 460–487. https://doi.org/10.1080/17480930.2023.2196918.
[6]. Armstrong, M., Lagos, T., Emery, X., Homem-de-Mello, T., Lagos, G., & Sauré, D. (2021). Adaptive open-pit mining planning under geological uncertainty. Resources Policy, 72, 102086. https://doi.org/https://doi.org/10.1016/j.resourpol.2021.102086.
[7]. Asad, M. W. A., & Dimitrakopoulos, R. (2013). Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand. Journal of the Operational Research Society, 64(2), 185–197. https://doi.org/10.1057/jors.2012.26.
[8]. Bakhtavar, E., Jafarpour, A., & Yousefi, S. (2017). Optimal production strategy of bimetallic deposits under technical and economic uncertainties using stochastic chance-constrained programming. Journal of Mining and Environment, 8(3), 475–485. https://doi.org/10.22044/jme.2017.934.
[9]. Bienstock, D., & Zuckerberg, M. (2010). Solving LP relaxations of large-scale precedence constrained problems. Lecture Notes in Computer Science (Including Subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 6080 LNCS, 1–14. https://doi.org/10.1007/978-3-642-13036-6_1.
[10]. Bley, A., Boland, N., Fricke, C., & Froyland, G. (2010). A strengthened formulation and cutting planes for the open pit mine production scheduling problem. Computers & Operations Research, 37(9), 1641–1647. https://doi.org/https://doi.org/10.1016/j.cor.2009.12.008.
[11]. Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., & Rubio, E. (2012). A New Algorithm for the Open-Pit Mine Production Scheduling Problem. Operations Research, 60(3), 517–528. http://www.jstor.org/stable/23260150.
[12]. Consuegra, F. R. A., & Dimitrakopoulos, R. (2010). Algorithmic approach to pushback design based on stochastic programming: Method, application and comparisons. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 119(2), 88–101. https://doi.org/10.1179/037178410X12780655704761.
[13]. Del Castillo, F., & Dimitrakopoulos, R. (2014). Joint effect of commodity price and geological uncertainty over the life of mine and ultimate pit limit. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 123(4), 207–219. https://doi.org/10.1179/1743286314Y.0000000069.
[14]. Dimitrakopoulos, R. G., & Abdel Sabour, S. A. (2007). Evaluating mine plans under uncertainty: Can the real options make a difference? Resources Policy, 32(3), 116–125. https://doi.org/10.1016/j.resourpol.2007.06.003.
[15]. Dimitrakopoulos, R., & Lamghari, A. (2022). Simultaneous stochastic optimization of mining complexes - mineral value chains: an overview of concepts, examples and comparisons. International Journal of Mining, Reclamation and Environment, 36(6), 443–460. https://doi.org/10.1080/17480930.2022.2065730.
[16]. Eduardo S. Schwartz. (1997). stochastic behaviour of commodity prices.pdf. In The Journal of Finance (Vol. 52, Issue 3, p. 51). https://static.twentyoverten.com/ 593e8a9e7299b471eaecf644/ H1tGPLaXM/The-Stochastic-Behavior-of-Commodity-Prices-Implications-for-Valuation-and-Hedging.pdf.
[17]. Eivazy, H., & Askari-Nasab, H. (2012a). A hierarchical open-pit mine production scheduling optimisation model Hesameddin Eivazy and Hooman Askari-Nasab *. Int. J. Mining and Mineral Engineering, 2.
[18]. Eivazy, H., & Askari-Nasab, H. (2012b). A mixed integer linear programming model for short-term open pit mine production scheduling. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 121(2), 97–108. https://doi.org/10.1179/1743286312Y.0000000006.
[19]. Fathollahzadeh, K., Waqar, M., Asad, A., & Mardaneh, E. (2021). Review of Solution Methodologies for Open Pit Mine Production Scheduling Problem. International Journal of Mining, Reclamation and Environment, 00(00), 1–36. https://doi.org/10.1080/17480930.2021.1888395.
[20]. Franco-Sepulveda, G., Campuzano, C., & Pineda, C. (2017). NPV risk simulation of an open pit gold mine project under the O’Hara cost model by using GAs. International Journal of Mining Science and Technology, 27(3), 557–565. https://doi.org/10.1016/j.ijmst.2017.03.004.
[21]. Gilani, S.-O., Sattarvand, J., Hajihassani, M., & Abdullah, S. S. (2020). A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty. Resources Policy, 68, 101738. https://doi.org/https://doi.org/10.1016/j.resourpol.2020.101738.
[22]. https://inflationdata.com/Inflation/Consumer_Price_Index/HistoricalCPI.aspx?reloaded=true. (n.d.).
[23]. INDEXMUNDI. 2018. Copper, grade A cathode, LME spot price. World Bank. http://www.indexmundi.com/commodities/?commodity= copper&months=300. (n.d.).
[24]. Jelvez, E., Ortiz, J., Varela, N. M., Askari-Nasab, H., & Nelis, G. (2023). A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty. Mathematics, 11(18). https://doi.org/10.3390/math11183907.
[25]. Khan, A., Asad, M. W. A., & Topal, E. (2023). A heuristic method for production scheduling of an open pit mining operation. International Journal of Mining, Reclamation and Environment, 1–13. https://doi.org/10.1080/17480930.2023.2281201.
[26]. Kumral, M. (2011). Incorporating geo-metallurgical information into mine production scheduling. Journal of the Operational Research Society, 62(1), 60–68. https://doi.org/10.1057/jors.2009.174.
[27]. Kumral, Mustafa. (2010). Robust stochastic mine production scheduling. Engineering Optimization, 42(6), 567–579. https://doi.org/10.1080/03052150903353336.
[28]. Kumral, Mustafa, & Sari, Y. A. (2017a). An application of possibilistic programming to production sequencing of mining parcels. International Journal of Management Science and Engineering Management, 12(2), 79–88. https://doi.org/10.1080/17509653.2016.1159147.
[29]. Kumral, Mustafa, & Sari, Y. A. (2017b). Simulation-based mine extraction sequencing with chance constrained risk tolerance. Simulation, 93(6), 527–539. https://doi.org/10.1177/0037549717692415.
[30]. Lambert, W. B., & Newman, A. M. (2014). Tailored Lagrangian Relaxation for the open pit block sequencing problem. Annals of Operations Research, 222(1), 419–438. https://doi.org/10.1007/s10479-012-1287-y.
[31]. Lamghari, A., & Dimitrakopoulos, R. (2012). A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. European Journal of Operational Research, 222(3), 642–652. https://doi.org/10.1016/j.ejor.2012.05.029.
[32]. Laroche-Boisvert, M., & Dimitrakopoulos, R. (2021). An application of simultaneous stochastic optimization at a large open-pit gold mining complex under supply uncertainty. Minerals, 11(2), 1–16. https://doi.org/10.3390/min11020172.
[33]. Liu, G., Guo, W., Fu, E., Yang, C., & Li, J. (2023). Dynamic optimization of open-pit coal mine production scheduling based on ARIMA and fuzzy structured element. Frontiers in Earth Science, 10(January), 1–16. https://doi.org/10.3389/feart.2022.1040464.
[34]. Lotfian, R., Gholamnejad, J., & Mirzaeian Lardkeyvan, Y. (2021). Effective solution of the long-term open pit production planning problem using block clustering. Engineering Optimization, 53(7), 1119–1134. https://doi.org/10.1080/0305215X.2020.1771703.
[35]. Meagher, C., Sabour, S. a A., & Dimitrakopoulos, R. (2009). Pushback Design of Open Pit Mines Under Geological and Market Uncertainties. In Orebody Modelling and Strategic Mine Planning (Vol. 17, Issue March, pp. 16–18).
[36]. Mohammadi, S., Kakaie, R., Ataei, M., & Pourzamani, E. (2017). Determination of the optimum cut-off grades and production scheduling in multi-product open pit mines using imperialist competitive algorithm (ICA). Resources Policy, 51(November 2016), 39–48. https://doi.org/10.1016/j.resourpol.2016.11.005.
[37]. Mokhtarian Asl, M., & Sattarvand, J. (2016). Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method. Journal of Mining and Environment, 7(2), 215–227. https://doi.org/10.22044/jme.2016.541.
[38]. Mokhtarian Asl, M., & Sattarvand, J. (2018). Integration of commodity price uncertainty in long-term open pit mine production planning by using an imperialist competitive algorithm . In Journal of the Southern African Institute of Mining and Metallurgy (Vol. 118, pp. 165–172). scieloza .
[39]. Moreno, E., Espinoza, D., & Goycoolea, M. (2010). Large-scale multi-period precedence constrained knapsack problem: A mining application. Electronic Notes in Discrete Mathematics, 36, 407–414. https://doi.org/https://doi.org/10.1016/j.endm.2010.05.052.
[40]. Osanloo, M., Gholamnejad, J., & Karimi, B. (2008). Long-term open pit mine production planning: A review of models and algorithms. International Journal of Mining, Reclamation and Environment, 22(1), 3–35. https://doi.org/10.1080/17480930601118947.
[41]. Rahmanpour, M., & Osanloo, M. (2016). Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty. Journal of the Southern African Institute of Mining and Metallurgy, 116, 229–236. http://www.scielo.org.za/scielo.php?script=sci_arttext&pid=S2225-62532016000300007&nrm=iso.
[42]. Ramazan, S. (2007). The new Fundamental Tree Algorithm for production scheduling of open pit mines. European Journal of Operational Research, 177(2), 1153–1166. https://doi.org/https://doi.org/10.1016/j.ejor.2005.12.035.
[43]. Ramazan, S., & Dimitrakopoulos, R. (2013). Production scheduling with uncertain supply: A new solution to the open pit mining problem. Optimization and Engineering, 14(2), 361–380. https://doi.org/10.1007/s11081-012-9186-2.
[44]. Rimélé, A., Dimitrakopoulos, R., & Gamache, M. (2020). A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty. Resources Policy, 65, 101570. https://doi.org/https://doi.org/10.1016/j.resourpol.2019.101570.
[45]. Sabour, S. A. and Wood, G. (2009). Modelling financial risk in open pit Decision-making, mine projects: implications for strategic. J. South. Afr. Inst. Min. Metall., 109, 169–175. http://www.scielo.org.za/scielo.php?script=sci_abstract&pid=S2225-62532009000300004&lng=en&nrm=iso.
[46]. Shenavar, M., Ataee-Pour, M., & Rahmanpour, M. (2021). Evaluation of Underground Mineable Reserve in Presence of Grade and Commodity Price Uncertainties. Journal of Mining and Environment, 12(2), 385–396. https://doi.org/10.22044/jme.2021.10301.1974.
[47]. Tabesh, M., & Askari-Nasab, H. (2011). Two-stage clustering algorithm for block aggregation in open pit mines. Mining Technology, 120(3), 158–169. https://doi.org/10.1179/1743286311Y.0000000009.
[48]. Tahernejad, M., Ataei, M., & Khalokakaie, R. (2018). A practical approach to open-pit mine planning under price uncertainty using information gap decision theory. Journal of Mining and Environment, 9(2), 527–537. https://doi.org/10.22044/jme.2017.6220.1439.
[49]. Tahernejad, M. M., Khalo Kakaei, R., & Ataei, M. (2018). Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran. International Journal of Mining and Geo-Engineering, 52(1), 53–60. https://ijmge.ut.ac.ir/article_66251.html.
[50]. Tolouei, K., Moosavi, E., Bangian Tabrizi, A. H., Afzal, P., & Aghajani Bazzazi, A. (2020). A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertainty. Journal of Mining and Environment, 11(3), 721–736.
[51]. Tolouei, K., Moosavi, E., Tabrizi, A. H. B., Afzal, P., & Bazzazi, A. A. (2021). An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms. International Journal of Mining, Reclamation and Environment, 35(2), 115–140.
[52]. Zeng, L., Qiang, S., Kozan, E., Corry, P., & Masoud, M. (2021). A comprehensive interdisciplinary review of mine supply chain management. Resources Policy, 74(January), 102274. https://doi.org/10.1016/j.resourpol.2021.102274.