Blast Design for Improved Productivity using a Modified Available Energy Method
1. Blast Design for Improved Productivity using a Modified Available Energy Method

S. Mulenga; R. Kaunda

Volume 11, Issue 3 , Summer 2020, , Pages 643-659

http://dx.doi.org/10.22044/jme.2020.9506.1861

Abstract
  In this work, a new drilling and blasting design methodology is introduced and applied at a case study mine to improve productivity. For the case study copper mine, a blast diameter ...  Read More