AN-EUL method for automatic interpretation of potential field data in unexploded ordnances (UXO) detection
1. AN-EUL method for automatic interpretation of potential field data in unexploded ordnances (UXO) detection

Maysam Abedi; Kiomars Mosazadeh; Hamid Dehghani; Ahmad MadanchiZare

Volume 5, Issue 2 , Summer 2014, Pages 67-77

Abstract
  We have applied an automatic interpretation method of potential data called AN-EUL in unexploded ordnance (UXO) prospective which is indeed a combination of the analytic signal and ...  Read More
A GIS-based weights-of-evidence model for mineral potential mapping of hydrothermal gold deposits in Torbat-e-Heydarieh area
2. A GIS-based weights-of-evidence model for mineral potential mapping of hydrothermal gold deposits in Torbat-e-Heydarieh area

Hossein Shahi; Abulghasem Kamkar Rouhani

Volume 5, Issue 2 , Summer 2014, Pages 79-89

Abstract
  The method of weights of evidence is one of the most important data driven methods for mineral potential mapping in GIS. In this method, considering the characteristics of known mineralized ...  Read More
Application of Bayesian decision making tool in detecting oil-water contact in a carbonate reservoir
3. Application of Bayesian decision making tool in detecting oil-water contact in a carbonate reservoir

Amir Mollajan; Hossein Memarian; Behzad Tokhmechi

Volume 5, Issue 2 , Summer 2014, Pages 91-97

Abstract
  Detection of Oil-Water Contacts (OWCs) is one of the primary tasks before evaluation of reservoir’s hydrocarbon in place, determining net pay zones and suitable depths for perforation ...  Read More
Pit lakes as an end use of mining: A review
4. Pit lakes as an end use of mining: A review

Anhay Soni; B. Mishra; Siddharth Singh

Volume 5, Issue 2 , Summer 2014, Pages 99-111

Abstract
  Theoretical review of ‘mining pit lakes’ indicates that like natural lakes such lakes display a huge diversity. They are typically in a non-equilibrium state with respect ...  Read More
Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine
5. Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine

Amid Morshedlou; Hesam Dehghani; Seyed Hadi Hoseinie

Volume 5, Issue 2 , Summer 2014, Pages 113-120

Abstract
  Utilizing the gathered failure data and failure interval data from Tabas coal mine in two years, this paper discusses the reliability of powered supports. The data sets were investigated ...  Read More
Optimization of cyanidation parameters to increase the capacity of Aghdarre gold mill
6. Optimization of cyanidation parameters to increase the capacity of Aghdarre gold mill

Bahman Ghobadi; Mohammad Noaparast; Seid Ziaedin Shafaei; Majid Unesi

Volume 5, Issue 2 , Summer 2014, Pages 121-128

Abstract
  This study investigates the optimization of gold dissolution from Aghdarre ore. Therefore, a laboratory investigation was initiated, to improve the leaching conditions with the objective ...  Read More