Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production ...
Read More
Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling in the sub-level caving method. In this work, for sub-level caving production scheduling optimization, a new mathematical model with the objective of net present value (NPV) maximization is developed. The general technical and operational constraints of the sub-level caving method such as opening and developments, production capacity, sub-level mining geometry, and ore access are considered in this model. Prior to the application of the scheduling model, the block model is processed to remove the unnecessary blocks. For this purpose, the floating stope algorithm is applied in order to determine the ultimate mine boundary and reduce the number of blocks that consequently reduces the running time of the model. The model is applied to a bauxite mine block model and the maximum NPV is determined, and then the mine development network is designed based on the optimal schedule.
J. Gholamnejad; A.R. Mojahedfar
Abstract
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage
that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic
and meta-heuristic algorithms to determine UPL. The optimization ...
Read More
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage
that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic
and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the
total profit whilst satisfying the operational requirement of safe wall slopes. In this paper the concept of largest pit with
non- negative value is suggested. A mathematical model based on integer programming is then developed to deal with
this objective. This model was applied on an iron ore deposit. Results showed that obtained pit with this objective is
larger than that of obtained by using net profit maximization and contains more ore, whilst the total net profit of
ultimate pit is not negative. This strategy can also increase the life of mine which is in accordance to the sustainable
development principals.