[1]. Alvarez Grima, M. and P.A. (2000). Bruines and P.N.W. Verhoef, Modeling tunnel boring machine performance by neuro-fuzzy methods, Tunnell. Undergr. Space Technol. 15 (3): 259–269.
[2]. Farrokh, E. (2013). Study of utilization factor and advance rate of hard rock TBMs. PhD dissertation, The Pennsylvania State University.
[3]. Farrokh, E. (2020). A study of various models used in the estimation of advance rates for hard rock TBMs, Tunneling and Underground Space Technology, Volume 97.
[4]. Gong, Q.M. (2005). Development of a rock mass characteristics model for TBM penetration rate prediction, PhD thesis, Nanyang Technology University.
[5]. Hassanpour J., Rostami J. and Zhao J. (2011). A new hard rock TBM performance prediction model for project planning, Tunneling and Underground Space Technology, 26 (5): 595-603.
[6]. Hassanpour, J. (2009). Investigation of the effect of engineering geological parameters on TBM performance and modifications to existing prediction models. Ph.D. Thesis, Tarbiat Modares University, Tehran, Iran.
[7]. Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A. and Tavakoli, H.R. (2010). TBM performance analysis in pyroclastic rocks: a case history of Karaj water conveyance tunnel, Rock Mech. Rock Eng, 43: 427–445.
[8]. Khademi Hamidi, J., Shahriar, K., Rezai, B. and Bejari, H. (2009). Application of Fuzzy Set Theory to Rock Engineering Classification Systems: An Illustration of the Rock Mass Excavability Index, Rock Mechanics and Rock Engineering, 43 (3): 335-350.
[9]. Ramezanzadeh, A., Rostami, J. and Kastner, R. (2005). Influence of Rock Mass Properties on Performance of Hard Rock TBMs. RETC, June 27-29, Seattle, Washington, USA.
[10]. Ribacchi, R, Lembo-Fazio, A. (2005). Influence of rock mass parameters on the performance of a TBM in a Gneissic formation (Varzo tunnel). Rock Mech Rock Eng., 38 (2):105–127
[11]. Rostami, J. (2016). Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground, Tunneling and Underground Space Technology, 57: 173-182.
[14]. Abd Al-Jalil, Y. (1998). Analysis of performance of tunnel boring machine-based systems, Ph.D. Thesis, The University of Texas at Austin.
[15]. Bieniawski, Z.T., Celada, B., Galera, J.M. and Tardáguila, I. (2008). New applications of the excavability index for selection of TBM types and predicting their performance, ITA World Tunneling Congress, Agra, India.
[16]. Khademi Hamidi, J., Shahriar, K., Rezai, B. and Bejari, H. (2009). Application of Fuzzy Set Theory to Rock Engineering Classification Systems: An Illustration of the Rock Mass Excavability Index, Rock Mechanics and Rock Engineering, 43 (3): 335-350.
[17]. Laughton, C. (1998). Evaluation and Prediction of Tunnel Boring Machine Performance in Variable Rock Masses. Ph.D. Thesis, the University of Texas at Austin.
[18]. Ahuja, H.N. and Nandakumar, V. (1985). Simulation model to forecast project completion time. Journal of Construction Engineering and Management, ASCE, 111 (4): 325- 342.
[19]. Farrokh, E., Rostami, J. and Laughton, Ch. (2011). Analysis of Unit Supporting Time and Support Installation Time for Open TBMs, Rock Mech Rock Eng 44:431–445.
[20]. Gratias, R., Allan, C. and Willis, D. (2014). The next level, why deeper is better for TBMs in mining, North American Tunneling, 118-125.
[21]. Maidl, B., Schmid, L., Ritz, W. and Herrenknecht, M. (2008). Hard rock tunnel boring machines.
[22]. Schmid, L. (2004). The development of the methodology of the shield tunneling in Switzerland. Geotechnique 27(2):193–200.
[23]. Wais, A., Wachter, R. (2009). Predicting the Learning Curve in TBM Tunneling. In Book "Tunnel Construction - Contributions from Research and Practice," Germany, Ch. 15, 143-154.
[24]. WBI-PRINT 6. (2007). Stability analysis and design for mechanized tunneling, Prof. Dr.-Ing. W. Wittke Consulting Engineers for Foundation Engineering and Construction in Rock Ltd.
[25]. Rostami, J., Farrokh, E., Laughton, Ch., Eslambolchi, S.S. (2014). Advance rate simulation for hard rock TBMs, KSCE Journal of Civil Engineering, 18(3): 837-852.
[26]. Brockway, J. (2016). EPB machines and interventions, Tunneling Short Course, Boulder CO, September 12 - 15, 2016.
[27]. Bevis, F.W., Finniear, C. and Towill, D.R. (1970). Prediction of operator performance during learning of repetitive tasks. International Journal of Production Research, 8, 293–305.
[28]. Gutjahr, W.J., Katzensteiner, S., Reiter, P., Stummer, C. and Denk, M. (2008). Competence-driven project portfolio selection, scheduling and staff assignment. Central European Journal of Operations Research, 16, 281–306.
[29]. Jin, H., Thomas, B. W. and Hewit, M. (2016). Integer programming techniques for makespan minimizing workforce assignment models that recognize human learning, Computers & Industrial Engineering.
[30]. Nembhard, D.A. and Norman, B.A. (2007). Cross Training in Production Systems with Human Learning and Forgetting. In D. A. Nembhard (Ed.), Workforce Cross Training chapter 4. (pp. 111–129). Boca Raton, FL, USA: CRC Press.
[31]. Sayin, S. and Karabati, S. (2007). Assigning cross-trained workers to depart ments: A two-stage optimization model to maximize utility and skill improvement. European Journal of Operational Research, 176, 1643–1658.
[32]. Wais, A. (2002). Possibilities and Limitations of Predicting Tunnel Boring Machine Advance Rates for the Assesment of Tunnel Project Costs, Master Thesis, University of Stuttgart, Institute of Hydraulic Engineering.
[33]. Farrokh, E., Rostami, J. and Laughton, Ch. (2012). Study of various models for estimation of penetration rate of hard rock TBMs, Tunnelling and Underground Space Technology, 30: 110-123.
[34]. Sharp, W. and Ozdemir, L. (1991). Computer Modeling for TBM Performance Prediction and Optimization. Proceedings of the International Symposium on Mine Mechanization and Automation, CSM/USBM, 1(4), 57–66.
[35]. US Army Corps of Engineers. (1997). Engineering and Design Tunnels and Shafts in Rock, Appendix C: Tunnel Boring Machine Performance-Concepts and Performance Prediction, Washington, D.C.
[36]. Rostami, J. (1997). Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Ph.D. Thesis, Colorado School of Mines, Golden, Colorado, USA.
[37]. ITA/AITES WG. 14. (2000). Recommendations and Guidelines for Tunnel Boring Machine, Lausanne.
[38]. Bruland, A. (1998). Hard Rock Tunnel Boring. Ph.D. Thesis, Norwegian University of Science and Technology, Trondheim.
[39]. Barton, N. (2000). TBM tunneling in jointed and faulted rock. A.A. Balkema Publishers, Rotterdam.
[40]. Bieniawski, Z. T., Celada, B., Galera, J.M. and Tardáguila, I. (2009). Prediction of cutter wear using RME, ITA-AITES World Tunnel Congress, Budapest.
[41]. Bieniawski, Z.T., Celada B. and Galera, JM. (2007). TBM excavability: prediction and machine–rock interaction. In: Proceedings of the Rapid Excavation and Tunneling Conference (RETC), Toronto, Canada, 1118–1130.
[42]. Bieniawski, Z.T., Celada, B. and Galera Fernandez, J.M. (2007). Predicting TBM Excavability-Part I. Tunnels & Tunneling International, p. 25.
[43]. Bieniawski, Z.T., Celada, B., Galera, J.M. and Álvares, M. (2006). Rock Mass Excavability (RME) index: a New Way to Selecting the Optimum Tunnel Construction Method, Proc. ITA World Tunneling Congress, Seoul.
[44]. Bieniawski, Z.T. and Grandori R. (2007). Predicting TBM Excavability-Part II. Tunnels & Tunneling International, 15-18.
[45]. Fallahpour, M., Karami, M. and Sherizadeh, T. (2019). Double-shield TBM performance analysis in clay formation: A case study in Iran, WTC, Italy, 795-804.