Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach
1. Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

A. Alipour; A. A. Khodaiari; A. Jafari; R. Tavakkoli-Moghaddam

Volume 8, Issue 2 , Spring 2017, , Pages 255-267

http://dx.doi.org/10.22044/jme.2017.849

Abstract
  Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling ...  Read More
Estimation of groundwater inflow situation using fuzzy logic: a case study (Beheshtabad water conveying tunnel, Iran)
2. Estimation of groundwater inflow situation using fuzzy logic: a case study (Beheshtabad water conveying tunnel, Iran)

M. Doustmohammadi; A. Jafari; O. Asghari

Volume 7, Issue 2 , Summer 2016, , Pages 229-238

http://dx.doi.org/10.22044/jme.2016.549

Abstract
  Water inflow is one of the most important challenges in the underground excavations. In addition to inducing working conditions and environmental problems, it decreases the stability ...  Read More