Exploitation
S. Moosazadeh; H. Aghababaie; Seyed H. Hoseinie; B. Ghodrati
Abstract
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel ...
Read More
Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and back-up system maintenance, surface and tunnel logistic maintenance, cutting tools’ replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
S. Hadi Hosseini; Mohammad Ataie; Hamid Aghababaie
Abstract
In this paper, after collecting the rock samples from eight mines and one high way slope, the tests for determination of dry density, Uniaxial Compressive Strength, tensile Strength (Brazilian Test), elastic modulus, Schmidt hammer rebound number have been done on samples. In addition, in order to calculating ...
Read More
In this paper, after collecting the rock samples from eight mines and one high way slope, the tests for determination of dry density, Uniaxial Compressive Strength, tensile Strength (Brazilian Test), elastic modulus, Schmidt hammer rebound number have been done on samples. In addition, in order to calculating the mean size of rock grains, quartz content, hardness and abrasivity, a thin sections of each rock have been studied. Then, the rock samples have been drilled using actual pneumatic top hammer drilling machine with 3½ inches diameter cross type bit. The regression analyses showed that Brazilian tensile strength (R2=0.81), uniaxial compressive strength (R2=0.77) and Schmidt hammer rebound (R2=0.73) are the most effective parameters on drilling rate and have a partly good correlation with drilling rate.