Hafeezur Rehman; Ahmad Shah; Mohd Hazizan bin Mohd Hashim; Naseer Muhammad Khan; Wahid Ali; Kausar Sultan Shah; Muhammad Junaid; Rafi Ullah; Muhammad Bilal Adeel
Abstract
The major factors affecting tunnel stability include the ground conditions, in-situ stresses, and project-related features. In this research work, critical strain, stress reduction factor (SRF), and capacity diagrams are used for tunnel stability analysis. For this purpose, eighteen tunnel sections are ...
Read More
The major factors affecting tunnel stability include the ground conditions, in-situ stresses, and project-related features. In this research work, critical strain, stress reduction factor (SRF), and capacity diagrams are used for tunnel stability analysis. For this purpose, eighteen tunnel sections are modelled using the FLAC2D software. The rock mass properties for the modelling are obtained using the RocLab software. The results obtained show that tunnel deformations in most cases are within the safety limit. Meanwhile, it is observed that the rock mass quality, tunnel size, and in-situ stresses contribute to the deformation. The resulting deformations also affect SRF. SRF depends on the in-situ stresses, rock mass quality, and excavation sequence. The capacity diagrams show that the liner experience stress-induced failures due to stress concentration at the tunnel corners. This study concludes that tunnel stability analysis must include an integrated approach that considers the rock quality, in-situ stress, excavation dimensions, and deformations.
Hafeezur Rehman; Wahid Ali; Kausar sultan Shah; Mohd Hazizan bin Mohd Hashim; Naseer Muhammad Khan; Muhammad Ali; Muhammad Kamran; Muhammad Junaid
Abstract
Support design is the main goal of the Q and rock mass rating (RMR) systems. An assessment of the Q and RMR system application in tunnelling involving high-stress ground conditions shows that the first system is more appropriate due to the stress reduction factor. Recently, these two systems have been ...
Read More
Support design is the main goal of the Q and rock mass rating (RMR) systems. An assessment of the Q and RMR system application in tunnelling involving high-stress ground conditions shows that the first system is more appropriate due to the stress reduction factor. Recently, these two systems have been empirically modified for designing the excavation support pattern in jointed and highly stressed rock-mass conditions. This research work aims to highlight the significance of the numerical modelling, and numerically evaluate the empirically suggested support design for tunnelling in such an environment. A typical horse-shoe-shaped headrace tunnel at the Bunji hydropower project site is selected for this work. The borehole coring data reveal that amphibolite and Iskere Gneiss are the main rock mass units along the tunnel route. An evaluation of the proposed support based on the modified empirical systems indicate that the modified systems suggest heavy support compared to the original empirical systems. The intact and mass rock properties of the rock units are used as the input for numerical modelling. From numerical modelling, the axial stresses on rock bolts, thrust bending moment of shotcrete, and rock load from modified RMR and Q-systems are compared with the previous studies. The results obtained indicate that the support system designed based on modified version of the empirical systems produce better results in terms of tunnel stability in high-stress fractured rock mass conditions.
S. Hussain; Z. Ur Rehman; N. Muhammad Khan; I. Ahmad; S. Raza; M. Tahir; A. Ullah; D. Afzal; A. Khan; M. Salman; S. Sherin
Abstract
The design of a stable slope in a rock mass environment is a quite complicated job due to the anisotropic behaviour of the rock mass. In this research work, the cut slopes at the Swat motorway in the weakest schist rock is numerically analyzed by the shear strength reduction (SSR) approach using the ...
Read More
The design of a stable slope in a rock mass environment is a quite complicated job due to the anisotropic behaviour of the rock mass. In this research work, the cut slopes at the Swat motorway in the weakest schist rock is numerically analyzed by the shear strength reduction (SSR) approach using the Finite Element-based 2D RS2 software. The slope is divided into two cases according to the nature of the rock. Each case of the cut slope is analyzed by two stabilization methods: 1) changing the characteristics of the slope 2) support system installation based on the Mohr-Coulomb (MCC) and Generalized Hoek and Brown (GHB) failure criteria in order to propose the most appropriate method for slope stabilization. The results obtained reveal that the Critical Strength Reduction Factor (CSRF) before applying the stabilization methods is 1.34 (MCC) and 1.04 (GHB) for Case-I and 1.21 (MCC) and 0.53 (GHB) for Case-II. CSRF for Case-I after changing the characteristics of the slope is observed to be 2.43 (MCC) and 2.33 (GHB), while for Case-II is 1.82 (MCC) and 1.26 (GHB), respectively. CSRF for Case-I after the support installation criteria is 1.59 (MCC) and 1.07 (GHB), while for Case-II is 1.65 (MCC) and 0.5 (GHB), respectively. Based on the comparative analysis, it is revealed that changing the characteristics of the slope method shows prominent results in both cases; therefore, this method can be effectively used in order to stabilize the slope in the weakest rock mass environment.
M. Ibrahim; N. Mohammad; Z. Ahmad; Sh. Bacha; N. Muhammad Khan; M. Iftikhar Khan
Abstract
In this work, we focus on the up-gradation of the copper ore of Qilla Saifullah in Pakistan through the froth flotation technique. The chemical analysis of the head copper ore sample reveal the presence of 2.85% Cu, 22% Fe2O3, 52.9% SiO2, and other minor minerals. The optimum grinding time and ...
Read More
In this work, we focus on the up-gradation of the copper ore of Qilla Saifullah in Pakistan through the froth flotation technique. The chemical analysis of the head copper ore sample reveal the presence of 2.85% Cu, 22% Fe2O3, 52.9% SiO2, and other minor minerals. The optimum grinding time and liberation size of the copper ore have been determined as 30 minutes and +149-105 µm, respectively, for further processing. The chemical reagents are optimized in order to get a maximum grade and recovery of the copper ore. After comparisons and analysis of the results obtained, it can be concluded that the maximum grade and recovery of the copper ore are achieved at the dosage 300 (g/t) of the collector potassium amyl xanthate (C6H11KOS2), 250 g/t of pine oil, 250 g/t of a depressant (Na2SiO3), conditioning time of 10 minutes for a collector, flotation time of 6 and 10 minutes, and pH of 10 using the froth flotation technique.
K. Sultan Shah; I. Mithal Jiskani; N. Muhammad Shahani; H. Ur Rehman; N. Muhammad Khan; S. Hussain
Abstract
In the mining sector, the barrier to obtain an efficient safety management system is the unavailability of future information regarding the accidents. This paper aims to use the auto-regressive integrated moving average (ARIMA) model, for the first time, to evaluate the underlying causes that affect ...
Read More
In the mining sector, the barrier to obtain an efficient safety management system is the unavailability of future information regarding the accidents. This paper aims to use the auto-regressive integrated moving average (ARIMA) model, for the first time, to evaluate the underlying causes that affect the safety management system corresponding to the number of accidents and fatalities in the surface and underground mining in Pakistan. The original application of the ARIMA model provides that how the number of accidents and fatalities is influenced by the implementation of various approaches to promote an effective safety management system. The ARIMA model requires the data series of the predicted elements with a random pattern over time and produce an equation. After the model identification, it may forecast the future pattern of the events based on its existing and future values. In this research work, the accident data for the period of 2006-2019-is collected from Inspectorate of Mines and Minerals (Pakistan), Mine Workers Federation, and newspapers in order to evaluate the long-term forecast. The results obtained reveal that ARIMA (2, 1, 0) is a suitable model for both the mining accidents and the workers’ fatalities. The number of accidents and fatalities are forecasted from 2020 to 2025. The results obtained suggest that the policy-makers should take a systematic consideration by evaluating the possible risks associated with an increased number of accidents and fatalities, and develop a safe and effective working platform.