M. Shenavar; M. Ataee-pour; M. Rahmanpour
Abstract
The uncertainty-based mine evaluation and optimization have been regarded as a critical issue. However, it has received less attention in the underground mines than in the open-pit mines due to the diversity of the underground mining methods, and the underground mining parameters' complexity. The grade ...
Read More
The uncertainty-based mine evaluation and optimization have been regarded as a critical issue. However, it has received less attention in the underground mines than in the open-pit mines due to the diversity of the underground mining methods, and the underground mining parameters' complexity. The grade and commodity price uncertainties play essential roles in mining projects. Mine planning by not incorporating these uncertainties is accompanied by risks. The evaluation and risk assessment of the mine plans is possible through evaluating the mineable reserve in the presence of such uncertainties. In the present work, we evaluate the effects of grade and commodity price uncertainties on the underground mining stope optimization and the resultant mineable reserve. In this regard, the stope boundary is studied both deterministically and stochastically in the presence of the grade and price uncertainties. For this purpose, in this work, we implement the conditional simulation in order to generate equally probable ore reserve models. Furthermore, we optimize the stope boundary using the floating-stope algorithm in each realization. Several decision support criteria including the 'mineable reserve,' 'metal-content,' 'profit,' and 'value-at-risk' are defined to assist the decision-maker in uncertain conditions. Finally, a procedure is defined in order to consider two types of uncertainty sources simultaneously in underground mining. It will guide the decision-maker toward the most appropriate stope boundary that best fits the mining company's requirements. The procedure is implemented in a bauxite mine, and the optimal stope boundary is determined concerning the different criteria.
M. Shenavar; M. Ataee-pour; M. Rahmanpour
Abstract
Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production ...
Read More
Production scheduling in underground mines is still a manual process, and achieving a truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problems. Among the underground mining methods, sub-level caving is a common mining method with a high production rate for hard rock mining. There are limited studies about long-term production scheduling in the sub-level caving method. In this work, for sub-level caving production scheduling optimization, a new mathematical model with the objective of net present value (NPV) maximization is developed. The general technical and operational constraints of the sub-level caving method such as opening and developments, production capacity, sub-level mining geometry, and ore access are considered in this model. Prior to the application of the scheduling model, the block model is processed to remove the unnecessary blocks. For this purpose, the floating stope algorithm is applied in order to determine the ultimate mine boundary and reduce the number of blocks that consequently reduces the running time of the model. The model is applied to a bauxite mine block model and the maximum NPV is determined, and then the mine development network is designed based on the optimal schedule.