Exploitation
Gopinath Samanta; Tapan Dey; Suranjan Sinha
Abstract
The optimal layout of the stope (stope boundary) in an underground metal mine maximizes the profit of a deposit, subject to the geotechnical and operational mining constraints such as stope length, stope width, stope height. Various approaches have been introduced to address the stope boundary optimization ...
Read More
The optimal layout of the stope (stope boundary) in an underground metal mine maximizes the profit of a deposit, subject to the geotechnical and operational mining constraints such as stope length, stope width, stope height. Various approaches have been introduced to address the stope boundary optimization problem, but due to the computational complexity and numerous practical constraints, the existing models offer partial solutions to the problem. In the present work, a mixed integer programming model has been developed by incorporating mining constraints in a three-dimensional framework. This model is developed based on profit maximization. The sensitivity analysis applied in a case study mine indicates that the model is efficient in assessing the upside potential and downside risk of profit under fluctuating metal prices and mining costs. Additionally, it can be applied at different stages of mine design to facilitate resource appraisal, selection of stoping methods, and comprehensive mine planning. In a practical application on a real orebody, it shows that the proposed model can generate upto 37.32% more profit compared to current stope design practice in the mines.
H. Shahriari; M. Honarmand; S. Mirzaei; A. Saffari
Abstract
This research work aims to discuss the methodology of using the drone-based data in the initial steps of the exploration program for the dimension stone deposits. A high-resolution imaging is performed by a low-cost commercial drone at the Emperador marble quarry, Kerman province, Iran. A ground resolution ...
Read More
This research work aims to discuss the methodology of using the drone-based data in the initial steps of the exploration program for the dimension stone deposits. A high-resolution imaging is performed by a low-cost commercial drone at the Emperador marble quarry, Kerman province, Iran. A ground resolution of 3 cm/pix is achieved by imaging at an altitude of 70 m in order to ensure the precise lithological and structural mapping. An accuracy of less than 5 cm is promised for the 3D photogrammetric products. Hence, the flight is performed with an 80% front and a 70% lateral image overlap. Furthermore, 18 ground control points (GCPs) are used in order to meet the required accuracy. Photogrammetric processing is done by the Agisoft PhotoScan software. The geology map is prepared through the visual geo-interpretation of the orthophoto image. The faults and fractures are delineated using the high-resolution orthophoto and hill-shade model in the ArcGIS software. Accordingly, the density map of fractures is produced, and the deposit is divided into five structural zones. The 3D deposit model with an accuracy of 2.8 cm is reconstructed based on the digital elevation model (DEM). A primary block model is generated using the 3D deposit model in the Datamine software in order to determine the resource for each structural zone. Finally, considering the amount of resource and situation of fractures, the priority of exploration for developing activities and appropriate methods is defined for each structural zone. The research work results have convinced us to include drone-based imagery in the initial steps of dimension stone exploration to consume the time and cost of the operation.