Volume 15 (2024)
Volume 14 (2023)
Volume 13 (2022)
Volume 12 (2021)
Volume 11 (2020)
Volume 10 (2019)
Volume 9 (2018)
Volume 8 (2017)
Volume 7 (2016)
Volume 6 (2015)
Volume 5 (2014)
Volume 4 (2013)
Volume 3 (2012)
Volume 2 (2011)
Volume 1 (2010)
Exploitation
Granite Downstream Production Dependent Size and Profitability Assessment: an application of Mathematical-based Artificial Intelligence Model and WipFrag Software

Blessing Olamide Taiwo; Oluwaseun Victor Famobuwa; Melodi Mbuyi Mata; Mohammed Sazid; Yewuhalashet Fissha; Victor Afolabi Jebutu; Adams Abiodun Akinlabi; Olaoluwa Bidemi Ogunyemi; Ozigi Abubakar

Volume 15, Issue 2 , April 2024, , Pages 497-515

https://doi.org/10.22044/jme.2023.13731.2543

Abstract
  The purpose of this research work is to create empirical models for assessing the profitability of granite aggregate production in Akure, Ondo State, aggregate quarries. In addition, an Artificial Neural Network (ANN) model for granite profitability was developed. A structured survey questionnaire was ...  Read More

Artificial Neural Network Modeling as an Approach to Limestone Blast Production Rate Prediction: a Comparison of PI-BANN and MVR Models

Blessing Olamide Taiwo; Gebretsadik Angesom; Yewuhalashet Fissha; Yemane Kide; Enming Li; Kiross Haile; Oluwaseun Augustine Oni

Volume 14, Issue 2 , April 2023, , Pages 375-388

https://doi.org/10.22044/jme.2023.12489.2266

Abstract
  Rock blast production rate (BPR) is one of the most crucial factors in the evaluation of mine project's performance. In order to improve the production of a limestone mine, the blast design parameters and image analysis results are used in this work to evaluate the BPR. Additionally, the effect of rock ...  Read More

Mine Geo-environment Assessment: Carbonate Rock Mine Waste as Construction Material Addictive and Coupled with Pollution Index Model

Blessing olamide Taiwo; Raymond O Aderoju; Olutosin Mojisola Falade; Yewuhalashet Fissha; O B Ogunyemi; A O Omosebi; S. Omeyoma; Oluwatomisin Victoria Adediran; H A Bamidele; Michael Ogundiran

Volume 14, Issue 1 , January 2023, , Pages 179-196

https://doi.org/10.22044/jme.2023.12691.2305

Abstract
  Overburden material is typically removed in surface mining operations to expose the primary ore deposit. Because of the presence of trace minerals, environmental pollution and acid drainage are caused when the overburdened materials are removed from the mine site and transported to another location. ...  Read More